Index.php
From Thikipedia
(Replaced content with 'four oh four error. [our error.]') |
(→highway empty: new section) |
||
Line 1: | Line 1: | ||
four oh four error. [our error.] | four oh four error. [our error.] | ||
+ | |||
+ | == highway empty == | ||
+ | |||
+ | 1,air jordan, a truck loaded with cardboard large trucks on the South Bank of Yibin big Xikou rollover car, leading to more than 30 tons of cardboard all is poured upon the earth, causing local about 10 kilometers traffic jam, traffic police and police at the scene maintenance dredging,, about 4 hours to generalist returned to normal,mercurial.<br>1 six thirty in the afternoon, the reporter sees in the spot, a large truck park on the side of the road, near dropped many board,jordan pas cher.Serious traffic congestion, every three or four meters there is traffic police on the spot hard to maintain order,air jordan pas cher, traffic.<br>As slow as a snail passage along which vehicles,.According to the truck driver,mercurial vapor, around 3 p.m., he in Daxi export a cardboard factory loaded with 30 tons of cardboard out after, on the path with Daxi export road place, because highway paving asphalt, thickening of approximately 10 cm in height,hollister, vehicle bump, causing car board pouring in,air jordan, blocking the road.<br>The driver said, his car nuclear load of 34 tons, 30 tons of actual load, no overload.Next to a witness said that the masses, cardboard stacking is a bit high, climbing up the car,, no fixed board is dumped down.<br>According to the site to maintain traffic order two battalion of the traffic control of a person in charge,burberry soldes, they receive after calling the police rushed to the scene, because the board held most of the area around the road, causing about 10 km road traffic congestion, hundreds of cars are unable to pass.<br>They sent out more than 30 police to the site to maintain order, and to assist the driver quickly clean up spilled on the ground board,moncler, highway empty, to divert vehicles to slow traffic.As of 1 at 7, most board cleared into trucks, traffic is gradually clear.<br>Related articles: | ||
+ | <ul> | ||
+ | |||
+ | <li>complete 87.9% missions</li> | ||
+ | |||
+ | <li>the courage to play spirit</li> | ||
+ | |||
+ | <li>high town</li> | ||
+ | |||
+ | </ul>The lenders said their mission has had "productive discussions" with the Cypriot authorities on the policy building blocks of a macroeconomic adjustment program. The authorities and the troika made "good progress" towards agreement on key policies to improve public finances, restore the health of the financial system, and strengthen competitiveness, so as to pave the way for the economy to return to sustained growth and financial stability. |
Revision as of 09:21, 25 November 2012
four oh four error. [our error.]
highway empty
1,air jordan, a truck loaded with cardboard large trucks on the South Bank of Yibin big Xikou rollover car, leading to more than 30 tons of cardboard all is poured upon the earth, causing local about 10 kilometers traffic jam, traffic police and police at the scene maintenance dredging,, about 4 hours to generalist returned to normal,mercurial.
1 six thirty in the afternoon, the reporter sees in the spot, a large truck park on the side of the road, near dropped many board,jordan pas cher.Serious traffic congestion, every three or four meters there is traffic police on the spot hard to maintain order,air jordan pas cher, traffic.
As slow as a snail passage along which vehicles,.According to the truck driver,mercurial vapor, around 3 p.m., he in Daxi export a cardboard factory loaded with 30 tons of cardboard out after, on the path with Daxi export road place, because highway paving asphalt, thickening of approximately 10 cm in height,hollister, vehicle bump, causing car board pouring in,air jordan, blocking the road.
The driver said, his car nuclear load of 34 tons, 30 tons of actual load, no overload.Next to a witness said that the masses, cardboard stacking is a bit high, climbing up the car,, no fixed board is dumped down.
According to the site to maintain traffic order two battalion of the traffic control of a person in charge,burberry soldes, they receive after calling the police rushed to the scene, because the board held most of the area around the road, causing about 10 km road traffic congestion, hundreds of cars are unable to pass.
They sent out more than 30 police to the site to maintain order, and to assist the driver quickly clean up spilled on the ground board,moncler, highway empty, to divert vehicles to slow traffic.As of 1 at 7, most board cleared into trucks, traffic is gradually clear.
Related articles:
- complete 87.9% missions
- the courage to play spirit
- high town