Drive
From Teamnumber1
(Difference between revisions)
m (→Drive To-Do List) |
m |
||
Line 1: | Line 1: | ||
- | |||
== Drive To-Do List == | == Drive To-Do List == | ||
Line 6: | Line 5: | ||
* Design a housing | * Design a housing | ||
* Control System - on-off, speed control (gearing on drill) | * Control System - on-off, speed control (gearing on drill) | ||
+ | |||
+ | ==Drill Specs== | ||
+ | See here: [[Drill Specs]] | ||
==Coupling== | ==Coupling== | ||
See here: [[Coupling]] | See here: [[Coupling]] |
Current revision as of 23:46, 11 May 2007
Drive To-Do List
- T-w curve for drill, by experiment
- Verify direct-drive concept
- Design a housing
- Control System - on-off, speed control (gearing on drill)
Drill Specs
See here: Drill Specs
Coupling
See here: Coupling