Meeting 2007.04.03 Analysis

From Teamnumber1

(Difference between revisions)

Revision as of 22:53, 3 April 2007

2.72 - Team Number 1
Group Meeting
April 3, 2007


  • Short-term To-do List:
    • Will & Dan --> Talk to Dave & Pat about rake angles on aluminum


  • Long-term To-do List:
    • Spindle Shaft design & bearing selection & consideration of collet
    • Structure design & construction
    • HTM's for elasticity
    • Feasibility of Accuracy = 10 microns
    • Rail analysis & bushing selection
    • Drive system
  • Considerations (to keep in mind):
    • Drive Train:
      • If using gears - must have a clutch
      • Belts with a "Christmas Tree?" - belts allow slipping at a dangerous torque!
      • Contingency (Direct Drive)
      • Bearings for driver
    • Will have to sit down with Prof. Culpepper & Chris to design the flecture