IRON QUEST/Status
From Egs Mayhem
Date: Day 64
Contents |
Central Unit
- Structural integrity: 100%
- >Processing...
Drone status
- >Mining drones: gold mines, phosphorus mines, river gorge
- >Construction drones: upgrading drone production plant
- >>Retrieval: at duties
- >Harvester drones: harvesting lumber, shrubberies, reseeding area
- >>1 constructor and 1 harvester performing upgrades on sensor arrays, burying power line
- >Prospector drones: surveying...
- >Haulage drones: carrying ore
- >Godhead1: monitoring tribe
- >Healer1: standing by...
- >Demon1: (1 - 2, 4) hidden outside village
- >WaterDemon: standing by...
- >Sniper1: (1 - 3) at Central, (4 - 5) at Au/Cu/Si/As mines, (6 - 7) at Fe/Al mines, (8 - 9) at dam, (10) at phosphorus mine
Construction Status
- >7 advanced construction drones
- Drone foundry (upgrade): 10 - 20% complete -- estimated 218.18 hours until completion. Revising estimate...
Queue - Structures
- 1. Drone construction facility (upgrade) - under construction
- 2. Sensor array upgrade - installing
- 3. Hydroelectric turbine - pending
- 4. Wireless power transmitter - pending
- 5. Chemical manufactorium (upgrade) - pending
- 6. Mine automation - pending
Queue - Drones
- 1. <no data>
Resources
Minerals
- Iron: High, not mining
- Aluminium: High, not mining
- Gold: Average, mining
- Silicon: Average, mining
- Copper: Average, mining
- Phosphorus: Average, mining
- Concrete: Average, mining
- Arsenic: Low, mining
Organic
- Alcohol: Average, not extracting
- Hydrogen: Error - unable to locate relevant data
- Wood (fuel): High, processing
Specialized drones
Godhead:
- Integrity: 100%
- Power: High
- Status: stationary, monitoring
Healer1:
- Integrity: 100%
- Power: High
- Status: stationary, standing by
Demon1 (#1 and 2, 4):
- Integrity: 99%
- Power: High
- Fuel: Very High
- Status: ambush
WaterDemon:
- Integrity: 99%
- Power: High
- Status: patrol
Sniper1 (#1 - 10):
- Integrity: 100%
- Power: Very High
- Status: standing by
Structures
- Central Unit: 100%
- Wood power plant: 100%
- Efficiency: 80% theoretical (73% actual)
- Chemical production plant (simple): 100%
- Drone production plant (advanced): under construction
- Sensor array (visual, radio, infrared): under construction
- Dam: 100%
- Road (to gold mine): 100%
- Road (to river): 100%